
Marisol Vega — NORCAL BUILD PROS
“LEED healthcare builds are unforgiving — one missing panel of copper wire kills a schedule. Stormhammer runs random-interval patrols so crews can't game the timing, and their supervisors sit in our safety stand-ups.”
Challenge
LEED-certified healthcare and civic builds could not tolerate schedule slippage from copper or specialty material theft — a single missing panel could push a substantial-completion date by weeks.
Stormhammer Security, Inc.'s Approach
- 01Random-interval overnight patrols so schedule-critical material lay-down zones can't be timed by outside crews.
- 02Site supervisor attends the GC's daily safety stand-up so patrol post orders update with the build.
- 03Photo documentation of every checkpoint keyed to the project's critical-path materials list.
Measurable Outcome
- ★Zero schedule-slip incidents tied to overnight theft across the reporting period.
- ★Patrol supervisor integrated into GC safety cadence — cited by the owner's rep in project close-out.
- ★Referral pipeline opened from LEED-AP owner's reps across the corridor.
Properties & scope
Civic and healthcare builds · Redding to Modesto · LEED AP BD+C projects
Verified firm reference: NORCAL BUILD PROS → norcal-build-pros.lovable.app
